Construction of Temporary Bridges after Floods in Slovenia
The paper deals with the process of constructing temporary bridges after the devastating floods that hit Slovenia at the beginning of August. The Czech Republic has decided to donate three TMS (heavy bridge set) bridges to the Republic of Slovenia as part of humanitarian aid. The article describes the process from the dispatch of a reconnaissance team, through the evaluation of the reconnaissance, to the construction itself. The paper is based on the experiences and observations of the author, who took part in all the processes as a direct participant.
- volume: 2024
- number: 2
- type: Ostatní / Other
Published in Zkušenosti a poznatky z operací
Keywords